Projects

White Street "The Prescott"

Completely restored, this elegant 1872 Victorian maintains its historic charm with original ashlar wood and granite steps in a picturesque Eagle Hill neighborhood. Also known as “Eastie”, East Boston boasts some of the most breathtaking views of the city skyline at Piers Park. A number of unique restaurants and retailers showcase the cultural diversity of the neighborhood. Maverick Square and Central Square are the main commercial areas, and are supported by East Boston Main Streets.

70 Bremen Condominiums East Boston, MA 02128

Luxury Mixed Use Residential/Commercial (5)story, 32 Condominium Units with Parking Garage and Retail/Commercial Space at Ground Level. Podium design steel/concrete and engineered wood structure, HVAC, Lobby/Package Delivery area with Luxury Amenities for Studio/1Bed/2Bed/3Bed units, Balconies, Patios and BDA/Fire Protection Systems. Video Intercom, Security Cameras for Urban living.

88/90 Bremen St

East Boston, MA

(6) Unit 2 bedroom development

7,000 sq. feet

 

37-53 Chelsea St

This Urban East Boston Infill Site was collapsing, and deemed uninhabitable and condemned for occupance by the City of Boston . The new buildings, still under construction are primarily residential with some commercial spaces.

Burrage House

Historical renovation and restoration of a "Brownstone" mansion into an upscale Board and Care Facility for the elderly. Naitonal Historical Register, City of Boston Landmark Commission.

Dedham Residence

Custom designed in the style of Frank Lloyd Wright, this modern contemporary home of 3,500sf was a retrofit over an existing 1950's style split-entry ranch home. The reconstruction required extensive demolition, new HVAC facilities, with a dazzling interior of maple and oak hardwood and custom millwork pieces. State-of-the-art Audio/Video room, weight-training and hobby room and custom designed kitchen with Hi-tech appliances. Additional garage, storage rooms and new stainless steel railing for the new redwood deck and full landscape and pool re-construction.

GFCC

Turn of the centruy US Treasury building constructed of large span reinforced concrete slabs, steel columns and limestone exterior was converted into a modern Christian Church over a 12 month renovation period. The phased construction allowed for fund raising efforts to match construction periods and the management team accomplished all its goals at a gala opening in May 2000. Balcony Phase II preparations, new bathrooms, HVAC, fire protection systems, 24' high glass enclosed entry foyer, ADA certifications, full kitchen for 700 meal capacity, seminar and classrooms.

Longwood Cricket Club

The 1999 Professional Tennis Season marked the centennial of the Davis Cup and the 100th Anniversary Davis Cup '99 was scheduled for the courts the Davis Cup was founded on in 1899 at the Longwood Cricket Club. Avary RT.G., Inc. was selected to perform the facility makeover in anticipation of this historic event. Commencing at the end of the 1998 season and working throughout the winter of 1998 and 1999, Avary RT.G., Inc. provided a complete renovation of the terraces, walkways and under building services areas.

WRB Waltham

Boston- Radio Towers up to 500 feet, transmission facilities for remote locations, recording studios, sales offices, AC/DC switch-operations for MCI Telecommunications and for the Charles River Broadcasting Studios. Hi-Rise building antennae and microwave connections are some of the expertise available from the BYBAS team. Full Design/Construct from studio to antennae, from broadcast booth to full spectrum broadcast bandwidth. Programming advertising and recording.

RADIO TRANSMISSION FACILITIES
Boston, Massachusetts, USA

 

Moseley House

300 year old magnificent church required ADA accesses and complete construction of an elegant functions and Church room. Renovation included new HVAC, electric, plumbing for new bathrooms, new function halls with custom matched oak panels and wood beam/purlin ceiling assembly. Sound deadening acoustic panels were inlaid into the ceiling assembly and custom plaster work. A new minstrel/music balcony overlook was also constructed.

Tamarind Bay

Renovation Restaurant from a Mexican theme to a Buddhist theme gourmet Indian cuisine. Seating for 60 with full commercial kitchen, egress, life safety, banquettes and wait stations. Rated “top Indian Cuisine” Boston magazine.

TAMARIND BAY INDIAN CUISINE Harvard Square Cambridge, MA

Toureen Kenels

The Toureen Pet Resort Complex is a 20,000sf of state-of-the-art retail pet and animal medicine facility with surgical suites, animal examination rooms, laboratory, and retail pet supply. The Kennels area consist of mezzanine levels for dog runs to accommodate 300 pets, exterior runs, luxury suite areas, dog grooming, pet daycare, and dog training. The cage areas are provided with sewer runs for cleaning, fully Air-Conditioned and heated/ventilated. Computer services, audio/video and security. Charles River Watershed compliance and EPA approvals.

Tremont Street Townhouse

Renovation and reconstruction of 5-story Brownstone Residence into 6-unit condominiums including roof decks, rear patio and masonry repoint and repair, new windows, floors, and all interior high-end conversion. New HVAC, Electric, Plumbing, Roof, Gutters and Stairway Entry in Limestone. Treatment for historical restorations and reproduction including new hardwood front door and period hardware.

Forever Fitness

As General Contractor, we installed a 20,000 sf state of the art Health Club on two floors for the Worcester Medical Center. We successfully completed all the unique applications required to construct a health club in a building designed for offices, including an open structural steel stairs between floors to allow for the club atmosphere between the exercise areas and the locker rooms. In the exercise areas it was necessary to remove the suspended ceil exposing the utilities housed above, great care was given to maintain a natural look.

Church of the Advent

Demolition and re-construction of front entry and vestibule. ADA accesses, HVAC, electric, plumbing, custom-matched oak panels, woodbeam/purlin ceiling assembly, wrought iron railings, and fire alarm system.

Dimock Community Health Center Gatehouse Building

Installation of 35,000sf office and health care facility on sloping ledge. Drill/blast 10,000cy rock, foundation grade beams, structural steel/masonry assembly. Design/build all interior systems. Semi-circular architecture with 60' overhang provides a dramatic feature with main entrance on the high side.

Burrage House Elderly Care Facility

Historical renovation and restoration of a brownstone mansion into an upscale board and care facility for the elderly. National Historical Register, City of Boston Landmark Commission.

Wing Fook Asian / Chinese Facility

Unique 10,000sf Pagoda-style facility for Buddhist/Taoist/Asian ceremonies. Marble and granite reception area. Offices and burial preparation areas. Deep concrete caisson and grade beam foundation. Steel/masonry structure. Asian-themed millwork and architectural columns.

Greater Framingham Community Church

Converted turn-of-the-century U.S. Treasury building into modern church. 12-month, phased construction allowed fundraising efforts to match construction periods. 24-foot high, glass-enclosed entry foyer; ADA certifications; 700-meal capacity kitchen; HVAC; and classrooms.

1st Parish Church, Medfield

Modern renovation of parish hall from 1890. Replacement of all glass and glazing, wood flooring, kitchens, mechanical, electrical, and plumbing. New lower entrances, ceilings and light fixtures. ADA compliant setup and prep work for a new elevator, elevator pit and electrical system.

Bank of America - First Community Banks

Occupied restoration and renovation of oldest continuing bank facility in Boston. High-quality, custom millwork; teller stations; office cubicles; and ATM operations. HVAC, lighting, interior plaster, and cornice restoration. Exterior site work, GFRC cornices, glass/glazing, and custom roofing.

Amenity Complex

Design/construct of 22,000sf recreation complex. Indoor/outdoor swimming pools, weight rooms, tennis courts, aerobics center, racquetball complex with glass-walled courts. Drill/blast 2,000cy rock for foundations, parking lots, HVAC, sprinkler systems, finishes, locker rooms, and sales offices.

Neponset Health Center / Harbor Health Services

Two-year, multi-phase renovation of entire 20,000sf health care facility. All work completed during full-occupancy. X-ray rooms, OB-GYN, mental health, urgent care, pediatrics, and offices. New millwork, finishes, lighting, HVAC, plumbing, fire alarm, stairways, windows, glass/glazing.

RoxComp Health Clinic

Renovation to the Mall area of this in-operation 22,000sf health clinic. Installation of 45,000sf roof, insulation, and HVAC equipment. Masonry repairs and exterior improvements. Tie-in of new work into occupied health care facility.

St. Vincent's Hospital/Worcester Medical Center

Installation of general conditions of 1,200,000sf office and health care facility on five-city block area. Two-year, $250 million project is state-of-the-art in health care. Interior finishes and installation of medical equipment. Coordination with Amtrak, Federal Highway, and city, state and municipal government.

N.E. Baptist Hospital

Renovation of Chief of Surgery Medical Suite. High quality millwork for staff operations, exam rooms, conference suite, medical equipment installation, connect computers and hospital telephone systems. Millwork entry, HVAC, electric, lighting, flooring and art installation.

94 Charles Street Inn

Conversion of historical six-story residence into a modern bed and breakfast, boutique hotel. Luxury suites with custom plaster moldings and millwork. Carpentry, plaster and stairway restoration. New HVAC, electric and fire services. ADA accesses, jacuzzis and kitchenettes.

Howard Johnson's Motor Lodge and Hotels

Kenmore Sq. and Fenway Park, Boston, MA; Memorial Dr., Cambridge, MA
Occupied renovation of common areas for three urban properties. Relocation of offices and conference rooms. Repair of structural flooring systems and restaurants. Installation of fire alarms, sprinklers, pump rooms, and utility connections. ADA compliance of ramps, stairways, bathrooms, and rooms.

Old Tymes Restaurant and Inn

Demolition and reconstruction of fire-damaged, colonial-style bed and breakfast with restaurant and lounge (150 seats cap.). Residential apartments, fully-functional restaurant facility, 6 inn rooms above restaurant. Parking, new foundations.

Theater District Tower

Design and construct state-of-the-art media assembly composed of structural steel towers, deep penetration concrete footings with caissons, media banner fencing, lighting and electric. Working with the City of Boston, Commonwealth of Massachusetts Department of Transportation and Boston City Arts Council.

Longwood Cricket and Tennis Club

Renovation and construction of new masonry terrace, balcony, underpinning and new foundation work, post-shoring support of existing building, decking surfaces, curved carpentry stairways, and over 3000lf of masonry walkway. Site drainage, mechanical and electrical work. ADA accesses.

Ben & Jerry’s Ice Cream

Installation of Ben & Jerry’s cow-themed ice cream restaurant on Newbury Street. Including all zoning, change of use, ADA access, and storage facility. Marketing marquee, ice cream servers, counters, millwork, brick restoration, and entries.

Bumpy Joe’s Restaurant

Renovation of Main Street, prime retail district restaurant/bar (120 seats cap.) on Martha’s Vineyard. New bar décor, kitchen upgrades, and minor interior renovations to the dining room.

Ilardo’s Pizza Delicatessen

Installation of full, 1,200sf restaurant and delicatessen operation in a food court setting inside Worcester Medical City complex. Kitchen equipment, FF&E, and counters for Italian pizza theme “deli” concept from Maryland based operator.

Java Centrale

Construction of 4,000sf franchise coffee facility. High-volume downtown location. Cappuccino, coffee, and proofing setups. Pastry ovens, marble, black lacquer finishes, light fixture supports, exterior canopy, and sub-sidewalk storage areas. City of Boston street requirements and fire suppression.

McDonald’s Restaurant

Interior renovation of restaurant sales area, new entrances, new HVAC, and ventilation for kitchen. Emergency catwalk in wrought iron roofway for service and duct cleaning. New counters, electrical, and fire department upgrades.

Milano's Restaurants

Installation of national chain, Italian-themed restaurant (380 seats cap.) with bar/lounge (150 seats cap.). Full kitchen, brick-oven, faux-art, glass and brass serving line, and Newbury Street patio. ADA and H/C compliance, FF&E, HVAC, electric, plumbing. Completed in six weeks.

SideCar Deli, Amtrak/MBTA, South Station

Construction of 550sf deli-style concept inside the South Station foodcourt. All grilles, kitchen equipment, code compliance, ductwork, and infrastructure connections. Finished millwork, stainless steel, counter, fronts, quarry tile, ceramic tile, and FRP panels. Completed in four weeks.

Tufts University Foundation Facility

Complete renovation and office redesign of the 5th floor of Tufts Medical Center. Addition of conference room, reception area, offices, and cafeteria. Computer workstations. 22,500sf new offices, sales, presentation, and meeting facility.

Station Street Condominiums

Six unit condominium development at Brookline Village Transit Depot. Two bedroom units with two baths, private under-garage for 14 vehicles, private elevator from garage to each living room, high security systems, private roof decks for each unit, roof served by private elevator, gas firplaces, granite countertopts, stainelss steel appliances, gas hydronic heat system with A/C, multi-level units available.

Theatre-by-the-Sea

Three-phase renovation of a historic 58-year-old Summer Stock theatre complex. New seating, lighting and sound systems, larger stage, and orchestra pit. Refurbished two-story, scenery barn, and original building now houses a restaurant and cabaret. New gazebo and arbor walk.

Toureen Pet Resorts

The Toureen Pet Resort Complex is a 20,000sf of state-of-the-art retail pet and animal medicine facility with surgical suites, animal examination rooms, laboratory, and retail pet supply. The Kennels area consist of mezzanine levels for dog runs to accommodate 300 pets, exterior runs, luxury suite areas, dog grooming, pet daycare, and dog training. The cage areas are provided with sewer runs for cleaning, fully Air-Conditioned and heated/ventilated. Computer services, audio/video and security. Charles River Watershed compliance and EPA approvals.

North Allston Apartment Complex

3-4-5 BEDROOM units with studies and full luxury amenity, individual laundry per unit, parking for 32 cars, 4 building complex on 32,000sf lot. City design, courtyard, sprinkler and fire protection systems. Fenced area and landscaping buffers, meets all City of Boston requirements for lodging and residential area in the Planned Overlay District.

East Boston Restoration City Block at Maverick Square

New construction of multi-family apartments 1,2,3 bedroom units. HVAC system, life safety systems, city utility connections rear Piazzetta amenity, rooftop decks with city landscape views of downtown Boston. New construction was placed on the sidewalk line with pedestrian protection during all operations. Piles support the structural grade beam foundation.

Tamarind Bay Indian Cuisine

Renovation Restaurant from a Mexican theme to a Buddhist theme gourmet Indian cuisine. Seating for 60 with full commercial kitchen, egress, life safety, banquettes and wait stations. Rated “top Indian Cuisine” Boston magazine.

Veterans Cemetary

Construction in 2004 of a 100 acre Veterans Memorial Cemetary for 3,500 crypts for Massachusetts DCAM and the Federal Veterans Administration on land donated by a local World War IIVeteran for that purpose in 1980.
Ground was frozen 36" due to an unusual cold in the fall of 2003 and operations included a ground thaw using glycol piping, pads and high pressure conduits. The intense heat generated in the piping is similar to conventional heating by the sun and achieved a 36" ground-cover thaw in 96 hours.

Mercer Road Museum

10,000sf complete renovation from an industrial factory to a private collection museum. The interior space houses "one of a kind" collection items from World War II, Third Reich, tanks, artillery pieces, period vehicles for display and several other private collections. The construction of a 30x30 concrete vault highlights the hi-end security systems for library and book storage. Working areas for restoration, gun collection work, and shipping/receiving. Exterior finish for modern appeal and new HVAC, fire suppression, and all utility parking lot work.

Emmanuel Baptist Church

Design-Build proposal for the rehabilitation of 14,000 square feet of the existing building and three phases of new construction totaling 16,000 square feet. New construction includes a new entrance lobby, a classroom wing around a skylight atrium, a multi-purpose facility, garage parking, administrative offices and a new steeple.

Beverly Crossing

Transit Oriented Development (TOD) for the Beverly MBTA/Amtrak Station in downtown Beverly, Massachusetts consisting of over 300,000sf of combined retail/residential and commercial space. As Owner/Developer, Builder, Avary RTG, Inc. together with a team of talented professionals, designed, permitted and financed this $100million development over a three (3) year period.

Forever Fit Center

Construction of 22,000sf, modern fitness facility. Showers, steam rooms, tanning salons, and weight, aerobic, golf, and Yoga silence rooms. Sound deadening installations, HVAC, interior partitions, and finish carpentry. Child care area, juice bar, computer center, and corporate offices.

Codman Estate, Westwood, MA

Restoration of 7,000sf circa 1890 Victorian carriage house. Relocation of main structure 600' onto new foundation. New wood support structure, interior mahogany finishes, timber beams, stairways, kitchen, utilities and landscape. Conversion of adjacent stable into 3-stall garage and mud room.

Armory House Condominiums

Twin eight-story condominium complex situated on 150-car, subterranean parking structure. Three-ply concrete, waterproofing fabric, roadways and masonry. Repair of massive water leaks into parking structure.10,000sf patio reconstruction, landscaping and pre-cast stair placement.

Connecticut Housing Authority Pequonnet & Beardsley Apt. Complexes

Installation of 667 units into revised floorplan utilizing existing brick and concrete public housing. Four mid-rise and 24 low-rise buildings. 26-month phased construction of occupied apartments, and complete internal and external renovations, from elevators and HVAC to play-areas and streets.

Dedham Residence

Retrofit of custom Frank Lloyd Wright-style design, over 3,500sf, 1950's split-entry ranch home. Dazzling interior of maple and oak hardwood, state-of-the-art audio/video room, weight-training room, and hi-tech kitchen. Redwood deck with stainless steel railing, full landscape, and pool re-construction.

Japanese-style Domo, Boxford MA

Construction of custom Japanese-design, 7,500sf home. Cut into landscape; full-size, tatami mat floor tea room; interior fish pools; bathrooms with soaking tubs, and teak and pine panels; hi-tech kitchen; state-of-the-art audio/video room and theatre; and computerized lighting for main areas.

Wall Street Tower Hi-Rise Apartments & Restaurant

Construction management of poured concrete, 18-story downtown residential tower and five-level concrete garage. Glass enclosed penthouse restaurant. Responsible for permit process to final completion, over 38 prime contractors, cash flow management from estimate to final releases.

Wellington Hill Estates Garden Apartments

Construction of residential community of 391 apartments. Wooded setting. Amenity complex including swimming pools, racquetball and tennis courts, steam rooms, and jacuzzi.

Frost Farm Village, Sudbury, MA

Construction of residential senior community with forty-four duplex condominium homes, on-site community meeting house, indoor and outdoor recreational facilities, and wooded area with dedicated conservation trails.

Charles Schwab & Company

Interior renovation for regional sales and executive offices for Charles Schwab & Company. New offices, work areas, glass partitions, and computer and telecommunications facilities.

DHL Airways

Installation of over 100,000sf freight terminal and handling facility. Offices, communications, and staff lounge and cafeteria. Bonded security and customs area, fleet maintenance and repair facility, 20-dock-door garage operation with CO monitoring and venting systems. HVAC, plumbing, electric.

Third Harbor Tunnel Boston - Big Dig

Bechtel / Parsons Brinckerhoff, Real Estate and Property consulting services for the Third Harbor Tunnel and Central Artery Depression. Specific projects include relocation feasibility at tunnel entrances and Depressed Artery interchange with the interstate highway system.

WCRB Radio - Radio Transmission Facilities

Full design/construct from studio to antennae, and broadcast booth to full-spectrum broadcast bandwidth. Radio towers up to 500 feet, transmission facilities for remote locations, recording studios, sales offices, and AC/DC switch-operations for MCI Telecommunications and the Charles River Broadcasting Studios.

RJR Nabisco Brands

Design/construct of 5,000sf, 1-story corporate office building. Dome-glass entry and contemporary office space combined with classic design to complement original, 84-year-old factory building. New structure, foundation, conference room interiors, HVAC, computer cooling area, plumbing, and electric.

Sugarbush Ski Resort

Multi-projects list for snowmaking system, child care center, offices and accounting. New personnel and human resources offices. Snowmaking pump houses and pump connections into water/air compressor system. Golf course beverage center.

Texas Instruments

Construction of 9,000sf high tech computer and A/V training facility. Conference center, classrooms, storefront, computer access offices, large bathroom facilities, and ADA access. Complete computer integration with main facility. HVAC, electric, plumbing, fire systems, and security tie-ins.

Kinko's Copy Centers, New England

Construction of six Kinko's retail outlets in Rhode Island, Massachusetts, and Connecticut as the chosen construction manager for New England. High-tech space with new electric services, HVAC, and leasehold improvements. Distinctive, Kinko's interior finish and retail fit-up for storefront.

Leslie's Swimming Pool Supplies - USA, Inc.

Design/Build of 12,000sf site for national chain swimming pool retail operations. Haz-Mat compliance and sprinklers for sale of hazardous materials. Mall-type construction with fascia and signage. ADA ramps, glass/aluminum entrances, delivery docks, and computer inventory system.

Bank of America, Jamaica Plain

Historic Bank headquarters restoration and renovation required complete interior restoration and renovation. High Quality custom millwork, Teller Stations, CSR, Office cubicles, ATM operations. Extensive ADA renovations for entries, bathrooms and ATM site. Exterior ATM and Drive-in Teller operations. New HVAC, Lighting, interior plaster and cornice restoration, glass/glazing, All construction completed as Occupied Renovation during and after bank hours.

Clara Barton Residence/ American Red Cross Building

Complete restoration and rehabilitation of 1860 wood-structure, residential mansion for use as commercial offices. Historical treatments throughout the structure, interior four-story elevator, kitchen facility, HVAC, electrical, and sprinkler. Basement archives for de-humidification.

Boston Nature Center of the Massachusetts Audubon Society - Norfolk, Lincoln & Framingham

Development, in downtown Boston, of the largest Audubon preserve in an urban setting. Reconstruction of former state hospital buildings, roadways, and walkways. Irrigation and site work for the restored, 220-plot Victory gardens. Installation of water, sewer, electrical, and fire services.